| | | | | | | | |
| Edit | 41763 | 1015 | 11688 | S/Y AZURE | On 05/10/2026 Service for the starboard generator, including:
- 15W40 oil
- Service kit 703
- 30-micron cartridge
- Labor
- Travel expenses
| 1 | 1360 | 0 |
| Edit | 41766 | 1017 | 11566 | M/Y LATIKO | Additional berthing for M/Y Latiko | 1 | 390 | 0 |
| Edit | 41768 | 1018 | 11805 | M/Y EUPHORIA | On October 5th:
Work performed due to a shore power line malfunction. A fault and a short circuit were found at the socket, caused by a loose L1 phase cable.
The 125-amp connector (supplied by us) was replaced.
The switchover from the onboard generator to shore power was successfully completed.
| 1 | 524 | 0 |
| Edit | 41769 | 1020 | 11798 | M/Y SOLARIS IV | 06/10/2026
Location: Marina di Stabia (NA)
CAT Generator Inspection - Port Side
The control unit was updated again.
The generator restarted without any issues. The operating data of the generator are excellent, and no mechanical abnormalities were detected.
A load test was also carried out, which was successfully completed. | 1 | 890 | 0 |
| Edit | 41770 | 1024 | 11805 | M/Y EUPHORIA | On 07/10/2026:
Fan-coil system purging and panel reprogramming.
| 1 | 200 | 0 |
| Edit | 41787 | 1032 | 11566 | M/Y LATIKO | Location: Stabia Main port;
Date: 12/10/2026
Area: Main Saloon MD
Main Saloon Carpet Water Damage
The Main Saloon was affected by a water leak. The wet carpet was cut manually by the crew to allow it to dry. The cut was irregular and uneven.
Proposed Works
- The proposed work involved removing the existing perimeter wooden strips, which showed signs of rust, and replacing them with new ones.
- The existing foam underlay (first layer) was to be reused, as it only required drying.
- The two manually cut sections of carpet were to be rejoined using reinforced double-sided adhesive tape. However, due to the irregular cut and the loss of carpet fibres along the edges, the joint line would remain visible after the repair.
Work Carried Out:
- Removal of the perimeter wooden strips;
- Installation of the foam underlay (first layer);
- Installation and fixing of new perimeter wooden strips;
- Repositioning of the carpet;
- Securing of the joint between carpet sections using reinforced double-sided adhesive tape;
- Cleaning. | 1 | 1000 | 0 |
| Edit | 41775 | 1034 | 11816 | M/Y ANDIAMO | Tube led | 21 | 7 | 20 |
| Edit | 41776 | 1034 | 11816 | M/Y ANDIAMO | Salt 25 kg | 4 | 11.9 | 0 |
| Edit | 41777 | 1034 | 11816 | M/Y ANDIAMO | Deliveries in Stabia Main Port | 1 | 65 | 0 |
| Edit | 41807 | 1035 | 11607 | M/Y SOLEMATES | Fernobus spray 400 ml | 6 | 15.9 | 0 |